Diese Seite gibt es noch nicht auf Deutsch — gezeigt wird die Fassung auf English.

Laufende Meldung — wird noch geprüft

LVM3 M5 launched CMS-03; upper stage re-entered

  • LVM3 M5 launched CMS-03 from Sriharikota on 2025-11-02.
  • CMS-03's orbit is listed as GTO, with 170 km and 29,970 km specifications.
  • The LVM3 M5 upper stage was passivated and tracked as NORAD id 66310.
  • US Space Command tracked the upper stage, while ISRO's IS4OM monitored orbital decay.
  • The upper stage re-entered the atmosphere on 2026-07-30.

Was geschehen ist

The LVM3 M5 upper stage re-entered the atmosphere on 2026-07-30. LVM3 M5 launched from Sriharikota on 2025-11-02 with the CMS-03 payload.

Was wir wissen

LVM3 M5 was the 5th operational flight of the LVM3. It launched from Sriharikota on 2025-11-02 carrying CMS-03 as the payload.

CMS-03's orbit is listed as GTO. The Geostationary Transfer Orbit specifications include 170 km and 29970 km.

The LVM3 M5 upper stage is listed as passivated. Its orbit is described as a highly elliptical GTO with 21 deg inclination.

US Space Command tracked the upper stage. Its NORAD id is 66310, and its International Designator is 2025-249A.

The upper stage is listed as atmospheric re-entry, and the associated date is 2026-07-30. IS4OM, an ISRO system, monitored orbital decay, while MOTR tracked the object.

Warum es zählt

The mission provides a verified record of an operational LVM3 flight carrying a payload to GTO. The upper stage's passivation, tracking, decay monitoring, and re-entry status also show how launch-related objects are accounted for after flight.

Quellen

  1. 1.ISRO Updates